Description
BFHS-JP — Fire Hydrant Systems & Jacking Pumps Logbook
A practical two-year logbook designed for recording routine service activities for fire hydrant systems and associated jacking pumps, in accordance with AS 1851—2012 (Incorporating Amendment 1). It provides dedicated fields for hydrant and booster inspections, pump starting pressures, pressure-reducing valves, water supply proving tests, hydrostatic and flow tests, jacking pump operation, defects and corrective actions, helping technicians maintain clear and consistent service records.
Specification
| Specification | Details |
|---|---|
| Product Name | Fire Hydrant Systems & Jacking Pumps Logbook |
| Product Code | BFHS-JP |
| Size | 238 × 148 mm |
| Copy Type | 3-Part Carbonless |
| Copies | White – Owner / Occupier / Agent · Yellow – Service Provider · Red – Book Copy |
| Record Period | 2 Years |
| Standard | AS 1851—2012 – Routine Service of Fire Protection Systems & Equipment (Incorporating Amendment 1) |
| Service Intervals | Monthly · Six-Monthly · Yearly · Five-Yearly |
| Applicable Systems | Fire Hydrant Systems · Above-Ground & Below-Ground Hydrants · Booster Assemblies · Pressure-Reducing / Pressure-Relief Valves · Jacking Pumps |
| Relevant Standard Sections | AS 1851—2012, Section 4 – Fire Hydrant Systems · Section 3 – Fire Pumpsets |
| Relevant Service Schedules | Tables 4.4.1, 4.4.2, 4.4.3, 4.4.4, 3.4.5.1 and 3.4.5.2 |
| Additional Records | Diesel & Electric Pump Starting Pressures · Battery & Charger Condition · Jacking Pump Cut-In / Cut-Out Pressures · Low-Side Pressure Readings · Water Supply Proving Tests · Pressure-Reducing / Relief Valve Tests · Booster Connection Flow Test · Hydrostatic Test · Defects / Corrective Actions · Notes |
| Writing Shield | Included to help prevent transfer onto following carbonless pages. |









