Description
BEFPNJP – Electric Fire Pumpset Logbook – Sprinkler & Hydrant Pumps & Jacking Pumps
A comprehensive two-year logbook designed for recording routine service activities for electric fire pumpsets and jacking pumps serving sprinkler and hydrant systems, in accordance with AS 1851—2012 (Incorporating Amendment 1). It provides dedicated fields for pump operation, pressure and flow testing, starting pressures, batteries, engine and motor readings, jacking pump cut-in/cut-out pressures, defects and corrective actions, making routine service records clear and consistent.
Specification
| Specification | Details |
|---|---|
| Product Name | Electric Fire Pumpset Logbook – Sprinkler & Hydrant Pumps & Jacking Pumps |
| Product Code | BEFPNJP |
| Size | 305 × 210 mm |
| Copy Type | 3-Part Carbonless |
| Copies | White – Owner / Occupier / Agent · Yellow – Service Provider · Red – Book Copy |
| Record Period | 2 Years |
| Standard | AS 1851—2012 – Routine Service of Fire Protection Systems & Equipment (Incorporating Amendment 1) |
| Service Intervals | Monthly · Six-Monthly · Yearly · Five-Yearly |
| Applicable Systems | Sprinkler Fire Pumps · Hydrant Fire Pumps · Combined Sprinkler & Hydrant Pumps · Electric Pumpsets · Jacking Pumps |
| Relevant Standard Section | AS 1851—2012, Section 3 – Fire Pumpsets |
| Relevant Service Schedules | Tables 3.4.1, 3.4.2, 3.4.3, 3.4.4, 3.4.5.1 and 3.4.5.2 |
| Additional Records | Pressure Gauge Readings · Pump Starting Pressure & Run Time · Suction & Discharge Pressure · Pumpset Flow Tests · Temperature & Oil Pressure · Battery & Charger Readings · Electric Motor Current & Speed · Jacking Pump Cut-In / Cut-Out Pressures · Defects / Corrective Actions · Notes |
| Writing Shield | Included to help prevent transfer onto following carbonless pages. |







